The first dig is maybe 3 cubic feet of dirt if you can pop in with a single hole.
The second dig requires a hole big enough to stand in while shoveling dirt up and out. Figure 5 feet on a side, or 175 cubic feet of dirt, or about 6.5 cubic yards of dirt. It’s a lot.
No comments:
Post a Comment
All comments are moderated, and all zombies, trolls, time wasters, and anonymous cowards will be shot.
If you do not know what that means, click here and read the whole thing.
If you are commenting on a post, be sure to actually read the post.
New information, corrections, and well-researched arguments are always appreciated.
- The Management